Review, governance & publication

Review & governance

The GII-US review, governance, and publication standard: the six-role review gate, the ten publication-eligibility conditions, the corrections and revisions policy, methodology versioning, and the structured appeals-and-public-challenges process.

6Review roles
10Eligibility conditionsAll must hold before a headline is published; failing one routes to a fallback product.
8Revision triggers
5Challenge dispositions

A GII value is publishable only when a reviewer can move backward from it to the evidence, and only after it clears review. This is the governance layer that turns a reproducible release into a public, challengeable, correctable dossier: the review gate, the eligibility conditions, the corrections policy, and the public-challenge process — the beta release template, challenge process, and correction policy.

The tables below are rendered live from @gii/governance.

Review roles#

Every release is reviewed for six concerns. Automation accelerates collection and screening; accountable reviewers approve legal scope, causal claims, and orientation. A high-impact release or a change to scoring methodology needs at least one independent methods review and one independent substantive review.

RolePrimary responsibilityBlocking examples
legal substantiveInstrument, authority, status, holding, scope, later treatment.Wrong operative text; Stay ignored; Jurisdiction misstated
data substantiveSource fitness, definitions, revisions, linkage, missingness.Denominator mismatch; Unstable series; Untracked revision
methods methodsCounterfactual, estimand, model, diagnostics, uncertainty.Invalid comparison; Confounding; Incorrect estimator
domain substantiveMechanism, outcome map, orientation, stakeholder context.Wrong benefit/burden rule; Omitted material pathway
editorial processClaims, readability, caveats, cross-output consistency.Causal overstatement; Misleading headline; Inconsistent values
release processVersioning, files, API, provenance, correction plan.Nonreproducible build; Missing source manifest

Publication eligibility#

An observed decision dossier may publish an observed headline score only when all ten conditions hold. If any fails, GII publishes a registry entry, forecast, descriptive note, or withhold notice instead — none carrying an observed headline. Withholding is a successful control, not a failure.

  1. The authoritative event and operative status are verified.
  2. Implementation and exposure are demonstrated.
  3. A theory of change and a preregistered outcome map exist.
  4. At least one direct stakeholder outcome is observed.
  5. The counterfactual and estimator meet the evidence standard.
  6. Required coverage is met.
  7. Overlap and transfer checks are resolved.
  8. Uncertainty and limitations are disclosed.
  9. Review gates are passed.
  10. The release is reproducible from its package.

Corrections & revisions#

A minor presentation correction may retain the analytic version with an errata timestamp. Any change to estimates, scores, causal claims, scope, or operative status creates a new analytic version. Prior releases remain retrievable and visibly superseded. These triggers open a revision:

TriggerDescription
data-revisionCorrected or benchmark-revised official data.
new-outcome-periodNew outcome periods or exposure evidence.
court-treatmentCourt stays, mandates, appeals, or later treatment.
statutory-amendmentStatutory or regulatory amendment, expiration, or rescission.
discovered-errorDiscovered source, code, classification, or aggregation error.
improved-designImproved causal design or materially different model.
revised-standardRevised outcome-orientation or weighting standard.
new-overlapNewly identified overlap with another lineage.

Methodology versioning

Appeals & public challenges#

A structured challenge corrects evidence and methodology; it is not a vote on whether a policy should be liked. Each one must identify five things and receives a tracking ID and a reasoned disposition. Submit one through the challenge portal.

Required fields.recordIddisputedClaimevidencerequestedChangesubmitterInterest
DispositionMeaning
acceptedThe disputed claim is corrected; a revision follows.
partially-acceptedSome of the requested change is adopted, with reasons for the remainder.
rejectedThe claim stands; the reason is recorded.
pending-evidenceHeld open awaiting the evidence needed to evaluate it.
outside-scopeNot an evidence or methodology dispute (e.g. a preference for a different policy).

Independence & conflicts#

Funding, data access, reviewer relationships, and affiliations that could affect an analysis are disclosed. A sponsor may identify questions but may not suppress an eligible result or privately alter a published rule. The scoring codebook, release criteria, and correction protocol are public before politically salient production scoring begins. The PEPI first-party relationship is disclosed and mitigated structurally: PEPI values never enter GII scores.

Machine-readable at GET /api/v1/governance, or via gii governance.